TIPS: Source Reduction
Good Operating Practices
| Separate types of hazardous waste to make them more amenable to recycling | |
| Separate hazardous waste from nonhazardous waste | |
| Improve maintenance scheduling, record-keeping, or procedures | |
| Change production schedule | |
| Other changes in operating practices |
Process Modifications
| Institute recirculation within a process | |
| Modify equipment, layout, or piping | |
| Use of a different process catalyst | |
| Institute better controls on operating bulk containers to minimize empty container disposal | |
| Change from small containers to bulk containers to minimize empty container disposal | |
| Other process modifications |
Inventory Control
| Institute procedures to reduce outdated material | |
| Test outdated material | |
| Eliminate shelf-life for stable materials | |
| Use better labeling procedures | |
| Institute clearinghouse to exchange materials | |
| Other changes in inventory control |
Surface Preparation and Finishing
| Modify spray systems or equipment | |
| Substitute coating materials used and/or improve application techniques | |
| Change from spray to other system | |
| Other surface preparation and finishing modifications |
Spill and Leak Prevention
| Improve storage and stacking procedures | |
| Improve procedures for loading, unloading, and transfer operations | |
| Install overflow alarms or automatic shut-off valves | |
| Install vapor recovery systems | |
| Implement inspection or monitoring program of potential spill and leak sources | |
| Other spill and leak prevention activities |
Cleaning and Degreasing
| Modify stripping/cleaning equipment | |
| Change to mechanical stripping/cleaning devices (from hazardous solvents to other materials) | |
| Change to aqueous cleaners | |
| Modify containment procedures for cleaning units | |
| Improve draining procedures | |
| Redesign parts racks to reduce drag out | |
| Modify or install rinse systems | |
| Improve rinse equipment design and/or operation |
Raw Material Modifications
| Increase purity of materials | |
| Substitute nonhazardous for hazardous raw materials | |
| Other raw material modifications |
Product Modifications
| Change product specifications | |
| Modify design or composition of product | |
| Modify packaging | |
| Other product modifications |
[ Related Links ][ Back to Previous Selection ]
[ Home ][ Pollutants ][ Tips ][ Links ]
[ Glossary ][ Help ][ Acknowledgement ][ Disclaimer ]